New 126,000 sf Tier IV Data Center

Construction of new Tier IV, 126,000 sf data center facility within existing campus. Schweiger provided design assistance, pre-construction and “flash track” phased construction to meet an aggressive, 15 month schedule. Schweiger and the project team continuously collaborated to incorporate numerous scope changes and overcome project challenges while maintaining the unforgiving completion date. No interruptions to the existing operations of adjacent data facilities were experienced during construction.

Project Scope

  • Construction of new 2 story precast building, connecting elevated walkway and equipment yard
  • Utility switches and transformers to support redundant 10/12 MVA service
  • All required water, storm and sanitary utilities as well as necessary site improvements
  • 43,000 sf raised floor computer room
  • Fully protected with double interlock pre-action sprinkler and fire alarm system throughout
  • Loading dock and staging areas including 12,000 lb service elevator
  • Main Service and Paralleling Switchgear, Building Power, Global Wrap and UPS Substations
  • On-site Load Bank
  • (3) 2.25 MW, 4160 volt Generators including on-site diesel Fuel Storage Tank Station
  • (2) 480 volt UPS Systems, each including (4) x 675 kW UPS Modules, Maintenance Bypass, Batteries and Remote Power Panels with branch circuit monitoring
  • (2) 1,200 ton Chillers and Associated Pumps with VFD drives
  • (4) 2,400 GPM Cross Flow Cooling Towers
  • (4) Above ground Thermal Storage Tanks
  • (4) Underground Makeup Water Storage Tanks
  • (16) 52,000 CFM Custom Built Up Air Handling Units with VFD drives to serve the Data Hall
  • Computer Room Air Conditioning, Fan Coil and Electric Duct and Unit Heaters, as required
  • Mimic Board to monitor and display power and equipment function